Serving Brooklyn Since 2022

Brooklyn'sFlood Restoration

Where Brooklyn grit meets modern restoration techniques. Protecting your homes and businesses with local expertise.

Local Brooklyn Team

100+ Properties Restored

Professional Flood Restoration in Brooklyn

Brooklyn's 24/7 Emergency Flood Response Team

60-Minute Response Time • All Brooklyn Neighborhoods

Our Restoration Process

Professional Water Damage Solutions

Emergency Water Extraction

Rapid water removal services with state-of-the-art equipment for immediate flood response.

Our Process Includes:

  • Immediate emergency response
  • Flood water removal
  • Advanced pumping equipment
  • Standing water elimination
Book Now

Structural Drying & Dehumidification

Professional-grade drying solutions to prevent long-term structural damage.

Complete Drying Process:

  • Industrial air movers
  • Professional dehumidifiers
  • Moisture tracking
  • Complete dry-out service
Book Now

Floor & Carpet Restoration

Comprehensive flooring restoration services for all types of water-damaged surfaces.

Restoration Services Include:

  • Hardwood floor repair/replacement
  • Carpet cleaning/replacement
  • Subfloor repair
  • Tile restoration
Book Now

Drywall & Paint Services

Expert wall restoration and painting services to restore your space.

Complete Wall Restoration:

  • Water-damaged wall removal
  • New drywall installation
  • Texture matching
  • Complete repainting
Book Now

Mold Remediation

Professional mold removal and prevention services to ensure a healthy environment.

Our Treatment Process:

  • Professional mold removal
  • Anti-microbial treatment
  • Air quality testing
  • Prevention protocols
Book Now

Kitchen & Bath Restoration

Specialized restoration services for water-damaged kitchens and bathrooms.

Restoration Services:

  • Cabinet repair/replacement
  • Countertop restoration
  • Plumbing inspection/repair
  • Fixture replacement
Book Now

BY THE NUMBERS

Fast Response, Reliable Results

500+
PROPERTIES RESTORED
60min
RESPONSE TIME
24/7
EMERGENCY SERVICE
100%
SATISFACTION RATE

RESTORATION PROCESS

Professional Restoration Timeline

While we respond quickly to emergencies, quality restoration requires proper time and attention to detail. Our comprehensive process typically spans 6 weeks to 6 months, ensuring every aspect is handled with precision and care.

STEP 1

Initial Response

24/7 emergency response and water extraction services

Within hours of contact
  • Complete property access coordination
  • Water classification (clean/gray/black)
  • Immediate safety hazard identification
  • Initial insurance contact
  • Preliminary damage documentation
  • Emergency power assessment
  • Initial extraction equipment setup
STEP 2

Professional Drying

Industrial-grade drying process with advanced monitoring

Minimum 7-14 days
  • Custom drying plan development
  • Moisture mapping creation
  • Daily moisture readings at marked points
  • Temperature and humidity monitoring
  • Equipment adjustment as needed
  • Daily progress documentation
  • Drying time estimates based on materials
STEP 3

Damage Analysis

Comprehensive evaluation of all affected areas and materials

Throughout drying (1-2 weeks)
  • Floor system evaluation (all layers)
  • Wall cavity inspection
  • Cabinet and millwork assessment
  • Ceiling and support evaluation
  • Electrical system inspection
  • Plumbing system assessment
  • HVAC system evaluation
  • Insulation condition check
  • Moisture barrier inspection
STEP 4

Insurance Coordination

Detailed claims management and scope development

2-3 weeks for initial process
  • Detailed photo documentation
  • Moisture reading logs
  • Line-item damage scope
  • Material replacement specifications
  • Code upgrade requirements
  • Additional damage documentation
  • Price verification process
  • Adjuster coordination
  • Supplemental claim preparation
STEP 5

Material Selection

Comprehensive selection of replacement materials and finishes

2-4 weeks for selections
  • Sample procurement and review
  • Material availability verification
  • Lead time assessment
  • Budget consideration for each item
  • Material grade selection
  • Color and style matching
  • Installation requirement review
  • Material ordering coordination
  • Storage and delivery planning
STEP 6

Removal & Preparation

Systematic demolition and site preparation

1-3 weeks based on scope
  • Work area isolation
  • Furniture and content protection
  • Floor covering removal
  • Cabinet and fixture removal
  • Drywall and insulation removal
  • Subfloor inspection and removal
  • Surface preparation
  • Debris removal and sorting
  • Anti-microbial treatment
STEP 7

Rebuilding Process

Comprehensive reconstruction of affected areas

4-12 weeks depending on scope
  • Framing repairs or replacement
  • Subfloor installation
  • Plumbing system repairs
  • Electrical system restoration
  • HVAC system repairs
  • Insulation installation
  • Drywall installation
  • Cabinet installation
  • Door and trim installation
  • Initial systems testing
STEP 8

Detail Work

Fine detail completion and finishing work

2-4 weeks for completion
  • Wall texturing
  • Primary paint coating
  • Trim installation and finishing
  • Floor finishing
  • Cabinet hardware installation
  • Fixture installation
  • Detail cleaning
  • Touch-up work
  • Final adjustments
STEP 9

Final Inspection

Quality assurance and project completion

1-2 weeks for final process
  • Detailed inspection process
  • Client walkthrough
  • Punch list completion
  • Final cleaning
  • Warranty documentation
  • Maintenance instructions
  • Final photographs
  • Insurance paperwork completion
  • Project closeout documents

Common Questions

Get answers about our flood restoration process

How quickly can you respond to a flood emergency?

We guarantee a 60-minute response time for emergencies across Brooklyn. Our rapid response team is available 24/7, fully equipped with industrial-grade water extraction and drying equipment to begin mitigation immediately.

What should I do while waiting for your team to arrive?

If safe to do so, turn off the main water supply if the flooding is from a pipe burst. Move valuable items to higher ground and avoid entering standing water due to electrical hazards. Document the damage with photos if possible, but your safety comes first.

Do you work with insurance companies?

Yes, we work directly with all major insurance companies in Brooklyn. We document everything thoroughly, provide detailed reports, and can help guide you through the claims process. We understand how to properly document water damage to ensure maximum coverage.

How do you prevent mold after water damage?

We use industrial dehumidifiers and air movers to thoroughly dry affected areas within 48-72 hours - the critical window for preventing mold growth. We also apply antimicrobial treatments when necessary and can perform testing to ensure moisture levels are back to normal.

How long does the restoration process take?

The timeline varies depending on the extent of water damage, but typically: Water extraction takes 2-4 hours, drying takes 2-3 days, and full restoration can take 5-7 days for standard projects. We'll provide you with a detailed timeline after our initial assessment.

What areas of Brooklyn do you serve?

We serve all Brooklyn neighborhoods including Williamsburg, DUMBO, Park Slope, Bedford-Stuyvesant, Crown Heights, and beyond. Our multiple teams are strategically positioned throughout Brooklyn to ensure rapid response anywhere in the borough.

Flood Emergency? We're Here 24/7

Brooklyn's rising force in water damage restoration. Fast response, tough solutions.